13/05/2024

Update on Caye Manger to Beausejour Road Project: Repairs, Widening, and Drainage Construction Underway

By Ministry of Infrastructire

Tap On The Photo To Go To The Website. http://Www.restlimited.com

Caye Manger to Beausejour road project update:
1.Repair of soft spots and placement of base material along the Beausejour road near wasco treatment plant. 2. Road widening works along sharp corner at Caye Manger road by extension of the existing bridge slab and construction of strong stone abutment walls.
3.Construction of new drainage sections along Caye Manger road.
4.Wasco repair works ongoing along the Beausejour road.
5.Milling works and placement of base material along Caye manger road continuing.
6.Asphalt Regulating works along Caye Manger roadĀ continuing.

TO RECEIVE NEWS NOTIFICATIONS VIA WHATS APP PLEASE SAVE OUR NUMBER AND SEND US A MESSAGE AT 7584896261 AND WE WILL ADD YOU TO OUR LIST

WhatsApp Image 2024-05-13 at 15.45.04_e4399447
WhatsApp Image 2024-05-13 at 3.49.46 PM (1)
WhatsApp Image 2024-05-05 at 09.08.44_e7e77253
WhatsApp Image 2024-05-03 at 16.43.46_1e3345f8
WhatsApp-Image-2024-03-02-at-5.01.48-PM-1